Sunday, September 28, 2008

Plan showing position of post relative to overall plan in picture below

Steel post Eastern verandah

Steel footings all in place


Steel posts in place

Steel posts delivered

Holes for steel footings

Workshop in construction

Workshop in construction

Workshop takes shape

Progress September 2008

Entry to House September 2008

Entry, garden to left, door to front

Covered terrace and edge of pond

Power is connected to the site

Completed Gabion Footings

Footings for Gabion Wall

Cement truck and pump

Cement pouring for Terrace


Nathan conducts the cement pouring orchestra

Alex at site Picnic July 2008

Alex & Nick at site July 2008

Visit to site in July 2008

Blockwork


Marking out levels

Mechanical Equipment for hole digging

Water Tanks in place

Wall at entry


Rendered wall at entrance in construction


Views and guideline posts

Still that amazing view in the background

Guideline levels of the envisaged building are set in wood

Building site entrance & signage



Water tank goes into place


Water tank hole created



Tree felling and wood chipping


Rollers go to work